Rebuilding the Dream, Pt 120

Only a little got done at the property this past week. Between the frigid temperatures and the Thanksgiving holiday, Mr. Contractor spent the week with his family. He got the backfill as complete as he could before he left.

(C) 2022, JJ Shaun
Backfill along the south and west walls.
(C) 2022, JJ Shaun
Looking south and west into the basement. It’s been covered to keep out moisture.

Only a day’s work, maybe two, and the basement should be ready to receive the house. Mr. Contractor needs to install the basement posts and frame the front walk-out. The next step will be to deliver the house. The slab will get poured once the space can be heated since Mother Nature did not cooperate with our plans.

This coming week’s weather will be cold, with one day of snow predicted. We once more pray to the weather gods to get the house set. Then this will all begin to feel real.

Check in next week to see how our building has progressed.

Previous: Rebuilding the Dream, Pt 119

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.