Rebuilding the Dream, Pt 119

Work on the house is going slowly. Mr. Contractor has been steadily moving dirt and burying the back side of the basement. His goal still is to have the basement ready to receive the house by the last week of November.

(C) 2022, JJ Shaun
Leveling the area above the house.
(C) 2022, JJ Shaun
The window well for the future basement bedroom.
(C) 2022, JJ Shaun
Building up the side.

The temperatures are still too cold to pour concrete, so it looks like Mr, Contractor will frame the front of the basement before the slab is poured. I suppose I shouldn’t be too surprised that the process is upside down and inside out; after all, it’s been this way from the beginning.

(C) 2022, JJ Shaun
Still waiting to be framed.

Today, we are having our family Thanksgiving, so we didn’t make it to the property much this week. We stuck close to our temporary home between dinner preparations and the weather.

We are grateful for our friends and family who have supported us through the past two years. While we still have plenty of work ahead of us, we thank everyone who has helped us get this far.

One thought on “Rebuilding the Dream, Pt 119

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.