Rebuilding the Dream, Pt 109

Nothing is happening at the property as we wait for the concrete to cure. Some forms have been removed, and the walls look almost dry where they’re exposed.

(C) 2022, JJ Shaun
The north end of the basement.
(C) 2022, JJ Shaun
The south end of the basement.

I didn’t have a measuring tape, but I estimate the walls are six inches thick, judging by the width of my spread hand.

(C) 2022, JJ Shaun
The basement walls are about six inches thick.

I’ll be heading up tomorrow, with a couple dozen donuts, to watch the rest of the forms come down. Then my bonus grandson and I will move some of the downed trees and brush out of the way of the next phase of our construction.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.