Wildfire Recovery

October 20, 2024October 19, 2024 JJ Shaun

Rebuilding the Dream, Pt 166

After 1458 days, First Reader and I finally received our permanent Certificate of Occupancy from the county. This was a few days shy of the four-year anniversary of losing the house to the Cameron Peak Fire. We still have work to do, but the building department now considers the house complete. Any new construction we … Continue reading Rebuilding the Dream, Pt 166

December 17, 2023December 16, 2023 JJ Shaun

Rebuilding the Dream, Pt 165

This is the last post of our journey to rebuild as the dream has finally come to fruition. As we gather our belongings in one place and sort through all that’s been donated, gifted, and purchased, we still have a lot of work ahead of us. What we can’t use, or have multiples of, we … Continue reading Rebuilding the Dream, Pt 165

December 10, 2023December 9, 2023 JJ Shaun

Rebuilding the Dream, Pt 164

We have spent the week moving. Because of the condition of our driveway, we’re finding that a pickup brigade is working best. After moving all that heavy stuff in Grandson’s delivery vehicle last Saturday, we had to pull the van out of the driveway on Sunday. We decided that if incoming cars and trucks don’t … Continue reading Rebuilding the Dream, Pt 164

December 3, 2023December 2, 2023 JJ Shaun

Rebuilding the Dream, Pt 163

On Monday, I received a phone call telling me the county approved our temporary occupancy. YAY! Of course, the mountain got more than a foot of snow over the weekend, so we weren’t able to move much during the week. We spent days lining up our ducks. By Wednesday, we realized we need a plow … Continue reading Rebuilding the Dream, Pt 163

November 26, 2023November 25, 2023 JJ Shaun

Rebuilding the Dream, Pt 162

We fell one approval short of getting our Temporary Certificate of Occupancy this week. The compliance inspector was up on Tuesday for our final TCO inspection. We expected a checklist for permanent occupancy, but thought we were ready for the temporary. Apparently, we’ll need an ‘IRC Code Modification’ approval to use the sliding glass doors … Continue reading Rebuilding the Dream, Pt 162

November 19, 2023November 18, 2023 JJ Shaun

Rebuilding the Dream, Pt 161

The word of the week: water. We finally got the plumber up to get the system up and running. Turns out, it wasn’t as easy as plug and play—they thought they connected incorrectly and burned the pump out. We shut the system down and cut power. He ordered a new water pump and double-checked the … Continue reading Rebuilding the Dream, Pt 161

November 12, 2023November 11, 2023 JJ Shaun

Rebuilding the Dream, Pt 160

Last Sunday night, we put out messages to the contractors asking when they would finish with their respective portions of our construction. Mr. Contractor let us know that the handrails from the main level to the basement were to be installed on Friday. They weren’t, but the company delivered the materials. (eyeroll) We needed to … Continue reading Rebuilding the Dream, Pt 160

November 5, 2023November 4, 2023 JJ Shaun

Rebuilding the Dream, Pt 159

It’s been another busy week as we work on the last of the tasks we need to get into the house. We’re waiting on the last of the prior inspection failures to pass on the second round. After that, we’ll look into what we need for the temporary Certificate of Occupancy. (C) 2023, JJ ShaunThe … Continue reading Rebuilding the Dream, Pt 159

October 29, 2023October 28, 2023 JJ Shaun

Rebuilding the Dream, Pt 158

What a week. We pushed to get the propane piping finished so we could get the furnace running before the arctic blast hit the region. Our major concern was filling the trenches before the freezing temperatures affected our water supply. The weather-guessers forecast the cold front to arrive Friday. We put a call out to … Continue reading Rebuilding the Dream, Pt 158

October 22, 2023October 21, 2023 JJ Shaun

Rebuilding the Dream, Pt 157

This has been a stressful week. We’ve reached the inspection stage of the project. The inspectors discovered a few minor issues and two major ones. One of the major issues is the need to rebuild the basement staircase. We caught one inspector as he was leaving the property a few days ago, and he verified … Continue reading Rebuilding the Dream, Pt 157

Posts navigation

Older posts

Blogs I Follow

  • ;
  • Paksworld
  • The Hermit Poet's Ramblings
  • Amethyst Review
  • WIL WHEATON dot NET

Text Widget

This is a text widget. The Text Widget allows you to add text or HTML to your sidebar. You can use a text widget to display text, links, images, HTML, or a combination of these. Edit them in the Widget section of the Customizer.

Social Media Integration

Sequential allows you display links to your social media profiles, like Twitter, Facebook and Google Plus, as icons using a custom menu.

Follow Us

  • Facebook
  • Twitter
  • Google Plus
  • CodePen
  • WordPress
  • Home
  • Rebuild the Dream
  • Stories
  • Adaran
  • Vignettes
  • Contact
  • About
Blog at WordPress.com.
;

A piece of my scattered mind.

Paksworld

Tavern Tales

The Hermit Poet's Ramblings

Poetry BLOG By Edge of Humanity Magazine

Amethyst Review

New Writing Engaging with the Sacred

WIL WHEATON dot NET

50,000 Monkeys at 50,000 Typewriters Can't Be Wrong

  • Subscribe Subscribed
    • J.J. Shaun
    • Join 544 other subscribers
    • Already have a WordPress.com account? Log in now.
    • J.J. Shaun
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...