#AmWriting

September 24, 2023September 23, 2023 JJ Shaun

Rebuilding the Dream, Pt 152

This past week saw more progress on the basement level. The downstairs level saw progress as they put in the slider and added treads to the stairs. However, we need to return three of the windows for manufacturing defects. (C) 2023, JJ ShaunAdding treads to the stairs. (C) 2023, JJ ShaunDownstairs sliding glass door. Most … Continue reading Rebuilding the Dream, Pt 152

September 17, 2023September 16, 2023 JJ Shaun

Rebuilding the Dream, Pt 151

We have visible progress on the house. (C) 2023, JJ ShaunThe basement, with the new siding and windows. (C) 2023, JJ ShaunThe lower windows and siding. Of course, First Reader and I thought more could have been done, considering what the crews accomplished in one day. (C) 2023, JJ ShaunLooking down the unfinished staircase. (C) … Continue reading Rebuilding the Dream, Pt 151

September 10, 2023September 9, 2023 JJ Shaun

Rebuilding the Dream, Pt 150

The house has been sitting on the foundation for sixty-three days. Tomorrow, Mr. Sub-Contractor will begin installing the basement windows and siding. (C) 2023, JJ ShaunThe basement windows. (C) 2023, JJ ShaunBasement materials. This coming week, the workers will close in the downstairs and build the stairs from the upper level to the lower level. … Continue reading Rebuilding the Dream, Pt 150

September 3, 2023September 1, 2023 JJ Shaun

Rebuilding the Dream, Pt 149

I’ve been staying in close contact with Mr. Sub-Contractor. He’s probably tiring of my asking, “Are you done yet?” This past week, the electrician was up to hook up electricity. Yay, the house now has lights. But not much more. The next task scheduled for completion next week is the downstairs window and door installation, … Continue reading Rebuilding the Dream, Pt 149

August 27, 2023August 26, 2023 JJ Shaun

Rebuilding the Dream, Pt 148

One thousand, forty-four days. That’s how long First Reader and I have been un-homed. Our contractor has not done a bloody thing since they placed the house on July 10. Wait, I take that back. They sealed the gables in the days following the delivery. Now, we wait for contractors to decide whether the drive … Continue reading Rebuilding the Dream, Pt 148

August 20, 2023August 19, 2023 JJ Shaun

A Week of Recovery

So, after successfully dodging COVID in South Dakota for the last three years, it caught us. I rode home Monday with a screaming headache, a scratchy throat, and a bit of a dry cough. It could have been allergies, since I neglected to pack an extra night’s worth of my asthma med. I kept my … Continue reading A Week of Recovery

August 13, 2023August 12, 2023 JJ Shaun

Sturgis 2023: Almost Heading Home

(C) 2023, JJ ShaunMotorcycles everywhere! What a week! Monday, we got rained in for most of the day. After a brief excursion to Walmart for the necessities we don’t have room to carry, we barely beat the precipitation back to the cabin. That was OK, though. The ride up was long and tiring, so having … Continue reading Sturgis 2023: Almost Heading Home

August 7, 2023 JJ Shaun

Sturgis Rally 2023, Day One

(C) 2023, JJ Shaun What a ride! (C) 2023, JJ ShaunGetting ready to leave. We arrived at our cabin around 7:00 PM Sunday evening. The ride was cooler this year than in previous years. Wearing the proper gear is key to a comfortable ride, so the cool temperatures and intermittent clouds were a challenge. I … Continue reading Sturgis Rally 2023, Day One

August 6, 2023August 5, 2023 JJ Shaun

Rebuilding the Dream, Pt 147

Every year, our region experiences monsoon season. A confluence of weather changes in the desert southwest, Gulf of Mexico, and Pacific Ocean draws moisture in from the south. This moisture clashes with the build-up of hot air in northern areas, which leads to afternoon thunderstorms. One year, the city recorded about six inches of rain … Continue reading Rebuilding the Dream, Pt 147

July 30, 2023July 29, 2023 JJ Shaun

Rebuilding the Dream, Pt 146

Now that Mr. Sub-Contractor has the measurements he needs, he’s spent the week getting bids for the project. We communicated late in the week, and he’s crunching numbers, so we should have more information by tomorrow or Tuesday. Having the house on the foundation and not seeing progress is almost more difficult than it not … Continue reading Rebuilding the Dream, Pt 146

Posts navigation

Older posts
Newer posts

Blogs I Follow

  • Nicole Aisling - Author
  • Life of Chaz
  • Weird Sisters Magazine
  • Paksworld
  • The Hermit Poet's Ramblings

Text Widget

This is a text widget. The Text Widget allows you to add text or HTML to your sidebar. You can use a text widget to display text, links, images, HTML, or a combination of these. Edit them in the Widget section of the Customizer.

Social Media Integration

Sequential allows you display links to your social media profiles, like Twitter, Facebook and Google Plus, as icons using a custom menu.

Follow Us

  • Facebook
  • Twitter
  • Google Plus
  • CodePen
  • WordPress
  • Home
  • Rebuild the Dream
  • Stories
  • Adaran
  • Vignettes
  • Contact
  • About
Blog at WordPress.com.
Nicole Aisling - Author

Dream ✨Imagine ✨ Believe

Life of Chaz

Books, games, music, and life — filtered through the mind of a writer, drummer, and philosopher who thinks too deeply about all of it. If it moves something in your chest, I'm interested.

Weird Sisters Magazine

Paksworld

Tavern Tales

The Hermit Poet's Ramblings

Poetry BLOG By Edge of Humanity Magazine

  • Subscribe Subscribed
    • J.J. Shaun
    • Join 538 other subscribers
    • Already have a WordPress.com account? Log in now.
    • J.J. Shaun
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
Loading Comments...