Skip to content
Top Content: Edit in the Customizer

J.J. Shaun

Tavern Tales

  • Home
  • Rebuild the Dream
  • Stories
  • Adaran
  • Vignettes
  • Contact
  • About

Rebuild the Dream

November 19, 2023November 18, 2023 JJ Shaun

Rebuilding the Dream, Pt 161

The word of the week: water. We finally got the plumber up to get the system up and running. Turns out, it wasn’t as easy as plug and play—they thought they connected incorrectly and burned the pump out. We shut the system down and cut power. He ordered a new water pump and double-checked the … Continue reading Rebuilding the Dream, Pt 161

November 12, 2023November 11, 2023 JJ Shaun

Rebuilding the Dream, Pt 160

Last Sunday night, we put out messages to the contractors asking when they would finish with their respective portions of our construction. Mr. Contractor let us know that the handrails from the main level to the basement were to be installed on Friday. They weren’t, but the company delivered the materials. (eyeroll) We needed to … Continue reading Rebuilding the Dream, Pt 160

November 5, 2023November 4, 2023 JJ Shaun

Rebuilding the Dream, Pt 159

It’s been another busy week as we work on the last of the tasks we need to get into the house. We’re waiting on the last of the prior inspection failures to pass on the second round. After that, we’ll look into what we need for the temporary Certificate of Occupancy. (C) 2023, JJ ShaunThe … Continue reading Rebuilding the Dream, Pt 159

October 29, 2023October 28, 2023 JJ Shaun

Rebuilding the Dream, Pt 158

What a week. We pushed to get the propane piping finished so we could get the furnace running before the arctic blast hit the region. Our major concern was filling the trenches before the freezing temperatures affected our water supply. The weather-guessers forecast the cold front to arrive Friday. We put a call out to … Continue reading Rebuilding the Dream, Pt 158

October 22, 2023October 21, 2023 JJ Shaun

Rebuilding the Dream, Pt 157

This has been a stressful week. We’ve reached the inspection stage of the project. The inspectors discovered a few minor issues and two major ones. One of the major issues is the need to rebuild the basement staircase. We caught one inspector as he was leaving the property a few days ago, and he verified … Continue reading Rebuilding the Dream, Pt 157

October 18, 2023October 17, 2023 JJ Shaun

Rebuilding the Dream, Pt 156

Today is the three-year anniversary of losing our home to wildfire. One-thousand-ninety-six days. Thankfully, we’ve reached quite a few milestones in the past month and a half. The finish line is in sight, but we’ll still have hoops to jump through when the seasons change and we can get crews and materials up the mountain. … Continue reading Rebuilding the Dream, Pt 156

October 15, 2023October 14, 2023 JJ Shaun

Rebuilding the Dream, Pt 155

I think we discovered one reason we are still unhomed. And the subtle homophobia infuriates me. We met with Mr. Contractor and the Sub he hired to do the bulk of the basement construction work about getting the decks done. Because the house is on a slope, we need three decks, each at a different … Continue reading Rebuilding the Dream, Pt 155

October 8, 2023October 7, 2023 JJ Shaun

Rebuilding the Dream, Pt 154

This week was a sh!t-show. When the finishing crew began to seal and drywall the seams where the halves meet, they discovered the walls did not meet flush. We can’t determine if the problem happened because the house sat on the sales lot for so long, almost tumbled off the mountain, or if the set … Continue reading Rebuilding the Dream, Pt 154

October 1, 2023September 30, 2023 JJ Shaun

Rebuilding the Dream, Pt 153

Now it’s happening. The plumber has almost completed his piece of the construction puzzle. He’s waiting on a part to complete the system, then we’ll be able to open the water valves and see if any leaks occur. With luck, the plumbing will be ready for inspection late in the week. 🤞🏼 (C) 2023, Peak … Continue reading Rebuilding the Dream, Pt 153

September 24, 2023September 23, 2023 JJ Shaun

Rebuilding the Dream, Pt 152

This past week saw more progress on the basement level. The downstairs level saw progress as they put in the slider and added treads to the stairs. However, we need to return three of the windows for manufacturing defects. (C) 2023, JJ ShaunAdding treads to the stairs. (C) 2023, JJ ShaunDownstairs sliding glass door. Most … Continue reading Rebuilding the Dream, Pt 152

Posts navigation

Older posts
Newer posts

Blogs I Follow

  • ;
  • Paksworld
  • The Hermit Poet's Ramblings
  • Amethyst Review
  • WIL WHEATON dot NET

Text Widget

This is a text widget. The Text Widget allows you to add text or HTML to your sidebar. You can use a text widget to display text, links, images, HTML, or a combination of these. Edit them in the Widget section of the Customizer.

Social Media Integration

Sequential allows you display links to your social media profiles, like Twitter, Facebook and Google Plus, as icons using a custom menu.

Follow Us

  • Facebook
  • Twitter
  • Google Plus
  • CodePen
  • WordPress
  • Home
  • Rebuild the Dream
  • Stories
  • Adaran
  • Vignettes
  • Contact
  • About
Blog at WordPress.com.
;

A piece of my scattered mind.

Paksworld

Tavern Tales

The Hermit Poet's Ramblings

Poetry BLOG By Edge of Humanity Magazine

Amethyst Review

New Writing Engaging with the Sacred

WIL WHEATON dot NET

50,000 Monkeys at 50,000 Typewriters Can't Be Wrong

  • Subscribe Subscribed
    • J.J. Shaun
    • Join 544 other subscribers
    • Already have a WordPress.com account? Log in now.
    • J.J. Shaun
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...