Now it’s happening. The plumber has almost completed his piece of the construction puzzle. He’s waiting on a part to complete the system, then we’ll be able to open the water valves and see if any leaks occur. With luck, the plumbing will be ready for inspection late in the week. 🤞🏼

The drains and water pipes.

Looking along the drains to the pressure tank.
The finishing crew (just two guys) has been getting the siding up on the ends when both are available.

The siding on the south wall.
One guy also works on repairs to the interior drywall when they both can’t be there.

Office wall before repairs.

Office wall after repairs.
There’s still a long way to go, but we’re getting there.